60
Installation
(6) Connect the two MT-100 tables using the connect-
ing plate. Set the connecting plate between the
tables and attach it using four screws.
(7) Insert the bridge between the lower conveyor and
the lower left cover, and push it down into posi-
tion.
(8) Lock the casters on both MT-100 tables.
(1) Remove a screw and the left receptacle cover on
the rear of the QC-S300. Mount the ground of sup-
port guide next to the connector using a screw.
(2) Attach solenoid connector A to the right connector
on the QC-S300F.
(3) Attach solenoid connector B to the connector on
the conveyor.
(4) Attach solenoid connector C to the left connector
on the QC-S300.
How to Install Multiple QC-S300F Collators
2109650202R1
Connecting Plate
2109650202S1
Support Guide
Wiring Between the QC-S300 and the QC-
S300F
2109650202T1
Left Receptacle
Cover
Support Guide
Ground
Washer
2109650202U1
QC-S300F
Connector B
Connector C
Connector A
2109650202V1
QC-S300F
Connector C
Connector B