FOOTBRIDGE ASSEMBLY INSTRUCTIONS
The footbridge may be assembled in alternative ways as shown on the sides of the pack. To make a
more permanent structure polystyrene cement (
not included)
may be used to secure the side steps to
the overbridge base and for fastening the support posts and bases.
Fit sidewalls (1) to overbridge base (2).
Use the
fl
exibility of the sidewalls to spring them
over the smoke de
fl
ector projections (3).
Clip on the four outriggers (4), engaging their tops as shown in inset (5).
Assemble side steps (6) to overbridge base noting how the small pegs
fi
t.
Push the tops of the support posts (7) into the holes as shown in inset (8)
and add the support bases (9).
The side steps inner walls (10) may now be clipped into position.
Use their
fl
exibility to engage their upper ends with the overbridge sidewalls.
1
2
3
1
2
1
5
4
8
7
9
6
10
9
10
6