Maintenance location
Work instructions
Interval
Fan
Fan
Check for leaks, function, speed setting
Protective fan grid
Clean from soiling
Impeller wheel
Check condition and fastening, clean of dirt deposits
Tighten the drive flange (first time after 50 hrs)
Leak oil return flow
Return flow pressure max. 5 bar
Pneumatic system
Fan, seed hoses and fall sluice
Leaks, crushing and chafing points, blockage
Hopper and distributor
Check for leak tightness, blockage, clean the distributor
Fertiliser metering unit
Roller and sealing lip
Check state, setting and wear - replace the sealing lip at
least once per year.
Rotor
Check for sticking cells, clean
Motor bearing and housing cover
Check for condition and smooth running
Half-width shut-off
Check the setting of the flap.
daily
Half-width shut-off (electric)
Check the setting of the flap.
Check function of half-width motor. End positions and
middle position must be accessed correctly.
The motor may need to be taught again
Follow the operating instructions for the
E-Manager
in this
regard.
Metering unit for micro metering
Hopper, distributor and metering unit
Remove residues and clean
Distributor tower for micro-granular
compound
Check distributor and hoses for damage and blockage,
clean the distributor
Wheels / brakes
Undercarriage / wheels
Check for damage (cracks, etc.)
daily
Check fastening / retighten wheel nuts - see above
see above
Check air pressure
(LI:= Load index) 20.8 - 520/85 R42 2.6 bar
650/65 R38 RT 657 2.4 bar
900/60 R32
3.2 bar
daily
Bearings of carrying axle journals
Check clearance and adjust if necessary
(must only be carried out by an expert workshop)
120 h /
6 months
Brake system
Check setting and function
daily
Drain air reservoir
daily
Check brake lines and hoses for damages, crushing points
and kinks
daily
Clean the pipe filter
Safety installations
Lighting and warning boards
Check condition and function
daily
86
87