20
(2) Defrost Termination: Defrost Recovery Step 1
a1)
Freezer (auxiliary code P-5 and earlier)–LEDs 4 (Comp) and 5 (ConFM)
are on. LED 3 (EvapFM on) is off
:
DTh warms to 100°F (38°C) or 1-hour
defrost timer terminates. DH de-energizes. 5-minutes later, Comp and ConFM
energize.
a2)
RFH1-SSB(-HS)(-HSE) Freezer–LEDs 4 (Comp and ConFM) and 5 (DrH,
PH, and MH) are on:
DTh warms to 100°F (38°C) or 1-hour defrost timer
terminates. DH de-energizes. 5-minutes later, Comp, ConFM, DrH, PH, and
MH energize.
(3) Defrost Termination: Defrost Recovery Step 2
a1)
Freezer (auxiliary code P-5 and earlier)– LEDs 4 (Comp) and 5 (ConFM)
are on. LED 3 (EvapFM on) is off
:
DTh cools to 70°F (21°C) or lower,
EvapFM energizes.
a2)
RFH1-SSB(-HS)(-HSE) Freezer–LEDs 4 (Comp and ConFM) and 5 (DrH,
PH, and MH) are on. LED 3 (EvapFM) is off:
DTh cools to 70°F (21°C) or
lower, EvapFM energizes.
(4) Defrost Completiton
a1)
Freezer (auxiliary code P-5 and earlier)–LEDs 4 (Comp), and 5 (ConFM)
are on. LED 3 (EvapFM on) off:
When CTh reads 15
°
F (8.3
°
C) above
setpoint or less, cabinet temperature is displayed on DB. Defrost is complete.
a2)
RFH1-SSB(-HS)(-HSE) Freezer–LEDs 4 (Comp and ConFM), and 5 (DrH,
PH, and MH) are on. LED 3 (EvapFM on) off:
When CTh reads 15
°
F (8.3
°
C)
above setpoint or less, cabinet temperature is displayed on DB. Defrost is
complete.