6) The following should occur in sequence:
6) The following should occur in sequence:
a) Water Reservoir will fill.
a) Water Reservoir will fill.
b) Gear Motor will start.
b) Gear Motor will start.
c) Compressor will start.
c) Compressor will start.
7) Replace the Front Panel in its correct position.
7) Replace the Front Panel in its correct position.
Fig. 4
Fig. 4
IMPORTANT
IMPORTANT
1. Check the conditions and quality of the ice production.
1. Check the conditions and quality of the ice production.
2. Do not use ice produced in the trial run. It might be contaminated with foreign
2. Do not use ice produced in the trial run. It might be contaminated with foreign
matter in the water circuit. Discard or flush down the drain.
matter in the water circuit. Discard or flush down the drain.
3. Clean the Storage Bin before use (see “III. 1. CLEANING” in Instruction
3. Clean the Storage Bin before use (see “III. 1. CLEANING” in Instruction
Manual).
Manual).
Control Box
Control Box
Operation
Operation
Switch
Switch
Motor
Motor
Protector
Protector
(3A)
(3A)
MOTOR PROTECTOR
MOTOR PROTECTOR
(3A)
(3A)
RUN
RUN
OPERATION SWITCH
OPERATION SWITCH
STOP
STOP
ICE
ICE
DRAIN
DRAIN
STOP
STOP
MODE
MODE
ICE
ICE STOP
STOP
Once STOP Button
Once STOP Button
is pushed, ICE Button
is pushed, ICE Button
cannot start ice pro-
cannot start ice pro-
duction for 20 min.
duction for 20 min.
Ice Button
Ice Button
Display
Display
Stop Button
Stop Button
Option Button
Option Button