55
55
E2AH5820209
E2AH5820209
15) Evacuate the system, and charge it with refrigerant. See the Nameplate for the required
15) Evacuate the system, and charge it with refrigerant. See the Nameplate for the required
refrigerant charge (See “1. [c] EVACUATION AND RECHARGE”).
refrigerant charge (See “1. [c] EVACUATION AND RECHARGE”).
16) Connect the Terminals to the Compressor, and replace the Terminal Cover in its correct
16) Connect the Terminals to the Compressor, and replace the Terminal Cover in its correct
position.
position.
17) Refit the panels in their correct position.
17) Refit the panels in their correct position.
18) Connect the power source.
18) Connect the power source.
4. DRIER
4. DRIER
IMPORTANT
IMPORTANT
Always install a new Drier every time the sealed refrigeration system is opened.
Always install a new Drier every time the sealed refrigeration system is opened.
Do not replace the Drier until after all other repair or replacement has been
Do not replace the Drier until after all other repair or replacement has been
made.
made.
1) Disconnect the power source.
1) Disconnect the power source.
2) Remove the Front Panel.
2) Remove the Front Panel.
3) Recover the refrigerant and store it in a proper container, if required by an applicable law
3) Recover the refrigerant and store it in a proper container, if required by an applicable law
(See “1. [b] REFRIGERANT RECOVERY”).
(See “1. [b] REFRIGERANT RECOVERY”).
4) Remove the Drier using brazing equipment.
4) Remove the Drier using brazing equipment.
5) Install the new Drier with the arrow on the Drier in the direction of the refrigerant flow. Use
5) Install the new Drier with the arrow on the Drier in the direction of the refrigerant flow. Use
nitrogen gas at the pressure of 0.2 - 0.3 bar when brazing the tubings.
nitrogen gas at the pressure of 0.2 - 0.3 bar when brazing the tubings.
6) Check for leaks using nitrogen gas (10 bar) and soap bubbles.
6) Check for leaks using nitrogen gas (10 bar) and soap bubbles.
7) Evacuate the system, and charge it with refrigerant. See the Nameplate for the required
7) Evacuate the system, and charge it with refrigerant. See the Nameplate for the required
refrigerant charge (See “1. [c] EVACUATION AND RECHARGE”).
refrigerant charge (See “1. [c] EVACUATION AND RECHARGE”).
8) Refit the Front Panel in its correct position.
8) Refit the Front Panel in its correct position.
9) Connect the power source.
9) Connect the power source.