56
6. HOT GAS VALVE
IMPORTANT
Always install a new drier every time the sealed refrigeration system is
opened. Do not replace the drier until after all other repair or replacement
has been made.
1) Unplug the icemaker or disconnect the power source.
2) Remove the top, front and right side panels.
3) Recover the refrigerant and store it in a proper container, if required by an applicable
law (See “1. [b] REFRIGERANT RECOVERY”).
4) Disconnect the hot gas valve leads.
5) Remove the screw and the solenoid coil.
6) Remove the valve and drier using brazing equipment.
7) Braze the new hot gas valve with nitrogen gas flowing at the pressure of 0.2 - 0.3
bar.
WARNING
Always protect the valve body by using a damp cloth to prevent the valve
from overheating. Do not braze with the valve body exceeding 120°C.
8) Install the new drier (See “3. DRIER”).
9) Check for leaks using nitrogen gas (10 bar) and soap bubbles.
10) Evacuate the system and charge it with refrigerant (See “1. [c] EVACUATION AND
RECHARGE”).
11) Attach the solenoid coil to the valve body, and secure it with the screw.
12) Connect the leads.
13) Replace the panels in their correct positions.
14) Plug in the icemaker or connect the power source.
Summary of Contents for IM-240ANE
Page 4: ...1 I SPECIFICATIONS 1 DIMENSIONS SPECIFICATIONS a IM 240DNE Air cooled ...
Page 5: ...2 b IM 240DNE C Air cooled ...
Page 6: ...3 c IM 240DWNE Water cooled ...
Page 7: ...4 d IM 240DWNE C Water cooled ...
Page 8: ...5 e IM 240DWNE R452 Water cooled ...
Page 9: ...6 f IM 240ANE Air cooled ...
Page 10: ...7 g IM 240AWNE Water cooled ...
Page 11: ...8 h IM 240DSNE Remote Air cooled ...
Page 12: ...9 j URC 240C E 4 Condenser Unit ...
Page 20: ...17 a CONTROLLER BOARD LAYOUT Main Board Sub Board Combination ...
Page 37: ...34 2 WIRING DIAGRAM a IM 240DNE C XNE C IM 240DWNE C R452 XWNE C R452 IM 240ANE AWNE ...
Page 38: ...35 b IM 240DSNE XSNE URC 240C E 4 ...
Page 69: ...66 Fig 16 Controller Board Board Support Control Box Cover Screw ...