13
II. Sequence of Operation and Service Diagnosis
A. Sequence of Operation Flow Chart
1. Operation Flow Chart
FS
chec
k
1 t
o 3-min.
har
vest timer
in
contr
ol (S4 dip s
witch
1 & 2)
Leg
end:
BC
–bin contr
ol
Comp
–compr
essor
DV
–dr
ain v
al
ve
FM
–f
an mot
or
FMR
–f
an mot
or
-r
emot
e
FS
–fl
oat s
witch
HGV
–hot g
as v
al
ve
L
LV
–liquid line v
al
ve
PM
–pump mot
or
WV
–inlet w
at
er v
al
ve
Components Ener
giz
ed when the Contr
ol S
witc
h is in the "PUMP" P
osition
W
hen the contr
ol s
witch is in the "PUMP" position po
w
er is supplied t
o the pump mot
or
. W
at
er t
ank cont
ents then fl
ows o
ver the outside of the
ev
apor
at
or plat
e assemb
ly
. Not
e:
W
at
er t
ank cont
ents does not fl
ow in-bet
w
een the e
vapor
at
or plat
es
.
Oper
ation Flo
w Char
t
1.
1
-Min
ut
e
Fill Cy
cle
C
ycl
e
St
eps
2.
Har
vest Cy
cle
•
WV
time:
6 min.
or the length of har
vest min
us 50 sec.
(S4 dip s
witch 7), whiche
ver is shor
ter
. Do not adjust S4
dip s
witch 7 out of the f
act
or
y position.
• Max.
har
vest time:
20 min.
Ther
mist
or
in contr
ol
3.
F
reez
e Cy
cle
• Min.
fr
eez
e time:
5 min.
• Max.
fr
eez
e time:
fr
eez
e timer set
ting (S4 dip
switch 9 & 1
0).
FS
in contr
ol
4.
P
ump-Out Cy
cle
• F
act
or
y set f
or e
ver
y 1
0th
cy
cle
(S4 dip s
witch 5)
• P
ump mot
or st
ops f
or
2
sec., then ener
giz
es
for 1
0/20 sec.
(S4 dip s
witch 3 & 4)
WV
ener
giz
ed
FS
open
Comp
ener
giz
ed
FMR
ener
giz
ed
HGV
ener
giz
ed
WV
ener
giz
ed
Ther
mist
or t
emper
atur
e r
eaches
48
°F (9°C) (3.9
kΩ or less).
Har
vest timer st
ar
ts
.
FS
open
Comp
ener
giz
ed
FM
ener
giz
ed
FMR
ener
giz
ed
PM
ener
giz
ed
L
LV
ener
giz
ed
HGV
de-ener
giz
ed
FS
closed
Comp
ener
giz
ed
DV
ener
giz
ed
FMR
ener
giz
ed
HGV
ener
giz
ed
PM
de-ener
giz
es f
or 2 sec.,
then ener
giz
es f
or 1
0/20 sec.
FM
de-ener
giz
ed
LL
V
de-ener
giz
ed
FS
chec
k
Star
tup
If
FS
is open, C
omp st
ops and c
ycle r
etur
ns t
o
1-Min.
fi
ll.
5-min.
minim
um
fr
eez
e timer in
contr
ol
FS
closed
FS
opens or fr
eez
e
timer t
er
minat
es
50 sec.
PM
ener
giz
ed
WV
de-ener
giz
ed
Har
vest P
ump
Timer
Anti-Slush
Ther
mist
or t
emper
atur
e
reaches 36°F (2.2°C)
(5.8 kΩ).
PM
de-ener
giz
ed f
or
10 sec.
Components Ener
giz
ed when the Contr
ol S
witc
h is in the "ON" or "PUMP" position and the Mode S
witc
h
is in the "CLEAN" P
osition
•
W
hen the contr
ol s
witch is in the "ON" position and the mode s
witch is in the "CLEAN" position po
w
er is supplied t
o the contr
ol boar
d K9 connect
or
. The contr
ol boar
d
then initiat
es a clean/sanitiz
e pr
og
ram.
See the maint
enance label on the t
op co
ver or the instr
uction man
ual f
or det
ails
.
•
W
hen the contr
ol s
witch is in the "PUMP" position and the mode s
witch is in the "CLEAN" position, onl
y the pump mot
or ener
giz
es and cir
culat
es w
at
er t
ank cont
ents
ov
er outside of e
vapor
at
or plat
e assemb
ly as the contr
ol boar
d po
w
er suppl
y has been disconnect
ed.
The Clean/S
anitiz
e pr
og
ram cannot initiat
e in this scenar
io
.
Summary of Contents for KM-350MAJ
Page 58: ...58 7 KM 660MWJ DATA PENDING ...