background image

STEP 12

Install two part number 501E1 (qty. 3) rollers into top 2 holes of door panel. 
Using provided CRL SOW wrench and spanner wrench to tighten roller to 
door glass.  See Figure 15, 16 and 17.

STEP 13

Carefully set door glass on bar for purposes of marking for center guide 
only. Hold glass plumb and mark both holes and install center guide (Part 
number 505S). See figure 18. It is important to put silicone in screw holes 
and properly silicone guide itself to avoid leaking.

NOTE: Guide has two settings. Use tighter setting for 3/8” glass.

STEP 14

Hang door on rail and install bottom roller loosely as in previous step for 
top rollers. See figure 19.

NOTE:  If having issues getting bottom roller installed see next step 
for cam system adjustment to allow extra clearance.

Page 73

Cardinal Shower Enclosures are manufactured by Hoskin & Muir, Inc.

Updated Dec 1, 2012

INSTALLATION INSTRUCTIONS

FIGURE 15

FIGURE 16

FIGURE 17

FIGURE 18

FIGURE 19

Reviews: