3)
Remove the subframe mounts by unbolting 2 bolts per mount using a 15mm socket. The Sway bar
should be hanging by it’s endlinks at this point. Retain all hardware and brackets for reinstallation.
4)
Detach the endlinks from the sway bar using a 21mm wrench and a 10mm wrench.
5)
Apply the provided grease to the new Hotchkis polyurethane bushings. Once greased, install the new
bushings onto your new Hotchkis sway bar.