hotcontrol temperature controller C 148

Rapid commissioning

The temperature controller is preconfigured 
at the factory for the operation of  
a regulation zone using a pre-configured 
heating element and a thermocouple.  
The commissioning of the control zone can 
therefore be executed in only a few steps.

Caution: 
Commissioning may only be executed 
by specialist personnel!
The Symbol calls attention to an 
operating procedure, practice, or the 
like, which, if not correctly performed 
or adhered to, could result in personal 
injury or da mage to or destruction of 
part or all of the product and system. 
Do not proceed bey ond a warning 
symbol until the indicated conditions 
are fully understood and met.

Step 1: Electrical connection

 

n

Connect sensor (here thermocouple) between terminals 5 (+) and 6 (-).

 

n

A solid state relay (SSR) is used as a power controller. 
Observe the heating output to be connected during the selection of the SSR.

 

n

Connect the control of the solid state relay  
to terminals 9 (+) and 10 (-) at the controller.

 

n

Connect the heating to the supply voltage and solid state relay. 
Use a super-fast fine-wire fuse or a super-fast circuit breaker  
to protect the heating circuit.

 

n

Connect the supply voltage of the controller via terminals 7 and 8 (here 230 VAC). 
Please also add a fuse here.