© 2022 Hoymiles Power Electronics Inc. All rights reserved.
05
Data Transfer Unit User Manual
4.3 System Installation Steps
Steps 1 to 6 need to be finished on site while steps 7 to 9 can be done either on site or at home. Step 6 must be done
correctly in order to complete site creation on S-Miles Cloud.
1. Install the PV modules and
microinverters
2. Locate the DTU
3. Connect the microinverter
to the grid
4. Power on DTU
5. Connect DTU with Internet
6.Use Micro Toolkit for onsite
inspection (optional). Check
the communication between
microinverters and DTU
7. Site creation
9. View data on S-Miles Cloud
8. Add microinverter ID