![background image](http://html.mh-extra.com/html/hp/11757b/11757b_installation-and-calibration-manual_165704009.webp)
Installation
and
Calibration
Introduction
This
section
pro
vides
the
information
needed
to
install
the
HP
11757B
Multipath
F
ading
Sim
ulator.
Included
is
information
p ertinen
t
to
initial
insp ection,
p o
w
er
requiremen
ts,
line
v
oltage
selection,
p o
w
er
cables,
in
terconnection,
en
vironmen
t,
instrumen
t
moun
ting,
storage,
and
shipmen
t.
In
addition,
this
section
con
tains
the
pro cedures
for
selecting
the
imp edance
of
the
instrumen
t
inputs
and
setting
the
HP-IB
address.
Initial
Inspection
W
arning
T
o
a
v
oid
hazardous
electrical
shock,
do
not
turn
on
the
instrument
when
there
are
signs
of
shipping
damage
to
any
portion
of
the
outer
enclosure
(co
v
ers,
panels,
display).
Insp ect
the
shipping
con
tainer
for
damage.
If
the
shipping
con
tainer
or
cushioning
material
is
damaged,
it
should
b e
k
ept
un
til
the
con
ten
ts
of
the
shipmen
t
ha
v
e
b een
c
hec
k
ed
for
completeness
and
the
instrumen
t
has
b een
c
hec
k
ed
mec
hanically
and
electrically
.
Pro
cedures
for
c
hec
king
electrical
p erformance
are
given
in
the
service
man
ual
as
w
ell
as
in
the
automated
p erformance
tests
found
in
this
man
ual.
If
the
con
ten
ts
are
incomplete,
if
there
is
mec
hanical
damage
or
defect,
or
if
the
instrumen
t
do es
not
pass
the
electrical
p erformance
1