6/12

Item Number

Description

Item Number

Description

1

Power socket

NOTE:

 The 4200vl Switch Series does not have a power switch. They are powered onwhen the power cord is connected to the

switch and to a power source.If installation requires a different power cord than the one supplied with the switch.

2. Check the LEDs on the switch and on each of the switch modules.

If the LED display is different than what is described, especially if the Fault LED stays on for more than approximately 120 seconds
or it startsflashing, the self test has not completed correctly. Refer to ProCurve 4200vl Switch Series troubleshooting page. 

Click

here to go to HPE ProCurve 4200vl Switch Series Troubleshooting    

.

Figure 5: Switch LEDs

Item Number

Description

1

Switch module LEDs:Link and Mode LEDs for each port

2

Switch chassis LEDs

When the switch is powered on, it performs its diagnostic self test. The entiredownload, initialization, and self test process can take up to 2
minutes for afully loaded chassis, depending on the number and type of modules installedin the switch.

LED Behavior:
During the self test:

Initially, Power and Fault, and all the switch chassis LEDs are ON. Then, after approximately 30 seconds, all the module LEDs go
ON as the modules receive power and code is downloaded to them, the Fault LED goes off,and the chassis LEDs go off except
PowerSelf TestFan Status, and PowerStatus.
When the download of code to the modules is completed, the module LEDs go off. User may see each port LED go ON briefly, in
sequence, as theport is tested.
For the duration of the self test, the Self Test LED stays ON.

When the self test completes successfully:

The Power LED stays on, and the Status LEDs on the switch chassis stay on for the devices installed: one for each switch module
installed, one for each power supply installed, and one for all the fans.
The Fault and Self Test LEDs are off.
The port LEDs on the switch modules go into their normal operational mode:

If the ports are connected to active network devices, the Link LEDsstay on and the Mode LEDs behave according to the mode
selected.In the default mode (Activity), the Mode LEDs should flicker showing network activity on the port.
If the ports are not connected to active network devices, the LED swill stay off.

top

Mount the switch

After the modules and optional power supply are installed and user have verified the switch passes self test, user are ready to mount the
switch in astable location. The 4200vl Switch Series can be mounted in these ways:

In a rack or cabinet
On a horizontal surface
On a wall

Rack or cabinet mounting
The Switch 4200vl Series is designed to be mounted in any EIA-standard 19 in telco rack or in an equipment cabinet such as a server
cabinet. If user are installing the switch in an equipment cabinet.

1. Use a #1 Phillips (Cross-head) screwdriver and attach the mounting brackets to the switch with the included 10 mm M4 screws.

For the 4204vl, 4202vl-48G, and 4202vl-72 Switch, each bracket is attached with two screws, and for the Switch 4208vl and its
bundles each bracket is attached with three screws as shown in the illustrations below.
Figure 6: Attaching brackets to a 3U chassis

Summary of Contents for 4202vl-48GS

Page 1: ... Getting Started Guide ProCurve Manager CD ROM and booklet Customer Support Warranty booklet Accessory kit 5065 6521 for the 8 slot 4208vl Switch 4208vl 64GSwitch 4208vl 96 Switch 4208vl 72GS Switch Accessory kit 5064 9943 for the 4 slot 4204vl Switch 4202vl 48G Switch 4202vl 72 Switch 4204vl 48GS Switch Each kit contains Two mounting brackets Six 10 mm M4 screws to attach the mounting brackets to...

Page 2: ...table for cable types and lengths Port Type Cable Type Length Limits Twisted pair cables 10 100 1000Base T For either 10 100 Mb s or 1000 Mbpsoperation Category 5 or better 100 ohm UTP or shielded Twisted pair STP balanced cable For 1000 Mbps Gigabit operation Category 5e cabling or better is recommended 100 m The Auto MDI MDI X feature only works when the port is in auto negotiation mode Fiber op...

Page 3: ... vl Modules can be installed in any of the slots User can install exchange or remove modules after the switch has been powered on Whenever a module is installed during this process it isinitialized and tested for correct operation During this process the switchSelf Test LED is on If user hot swap another module while the switch isinitializing and testing the first module it is possible to cause th...

Page 4: ...n Each supply provides enough power to operate afully loaded switch so even if one fails the switch will continue to operate normally Install the second power supply into power slot number 2 as shown in figure 3 The slot cover can be removed with either a flat bladed or Torx T 10 screwdriver Retain the slot cover for future use CAUTION The switch power supplies are hot swappable they can be instal...

Page 5: ...p Verify the switch passes self test After user have installed any modules and the optional second power supply but before mounting the switch in its network location user should first verify it is working properly by plugging it into a power source and verifying it passesits self test If user have installed a second power supply repeat these procedures with thesecond power supply to verify it wor...

Page 6: ...Ds go off User may see each port LED go ON briefly in sequence as theport is tested For the duration of the self test the Self Test LED stays ON When the self test completes successfully The Power LED stays on and the Status LEDs on the switch chassis stay on for the devices installed one for each switch module installed one for each power supply installed and one for all the fans The Fault and Se...

Page 7: ...0 5 in apart in each rack cabinet upright as shownin the illustration below Ensure that the screws are at the same level ineach upright Figure 8 Partially installed screw for bracket notch Item Number Description 1 Partially install a screw into the top hole of aclose 0 5 in pair on both sides of the rack 3 Place the switch in the rack and lower it so the notches in the bottom of the bracket slide...

Page 8: ...e 12 24 screws supplied with the switch use the clips and screws that came withthe cabinet Plan which four holes user will be using in the cabinet and installall four clips and partially install the two bottom screws as described in step2 before proceeding to step 3 top Horizontal surface mounting Place the switch on a table or other horizontal surface Use a sturdy surface in an uncluttered area U...

Page 9: ...cketsto the switch with the included10 mm M4 screws Figure 11 Attaching brackets to the rear of the switch Item Number Description 1 10 mm M4 screws 2 Attach the switch to the wall or wood surface with four 5 8 in number12 wood screwsor larger Not included Figure 12 Mounting to a wall Item Number Description 1 5 8 in number 12 wood screws top top Connect the switch to a power source 1 Plug the inc...

Page 10: ...ming switch management tasks including the following Monitor switch and port status and observe network activity statistics Modify the switch s configuration Read the event log and access diagnostic tools to help in troubleshooting Download new software to the switch Add passwords to control access to the switch from the console web browser interface and network management stations The console can...

Page 11: ...Configuration Guide top Hot swapping switch modules The switch modules can be hot swapped that is installed or replaced whilethe switch is powered ON The procedures differ slightly though between adding new modules to an empty slot or replacing modules with the same type and exchanging the module with a different type Adding or Replacing Modules If a module has to be replaced with one of the same ...

Page 12: ...r its affiliates subcontractors or suppliers will be liable for incidental special or consequential damages including downtime cost lost profits damages relating to the procurement of substitute products or services or damages for loss of data or software restoration The information in this document is subject to change without notice Hewlett Packard Enterprise Development and the names of Hewlett...

Reviews: