background image

9/18/2020

HPE 4200 vl Switch Series - Installation

3/12

Port Type

Cable Type

Length Limits

Copper cables

CX4

Shielded twisted-pair cables complying withthe 802.3ak standard.

0.5 - 15 m CX4

NOTE:

  The Series 4200vl Switch devices are compatible with the IEEE 802.3ab standard including the Auto MDI/MDI-X feature,which allows use of either straight-

through orcrossover twisted-pair cables for connecting to any network devices including end nodes,such as computers, or to other switches, hubs and routers.

Installation location: Before installing the switch, plan its location andorientation relative to other devices and equipment:

In the front of the switch, leave at least 7.6 cm (3 in) of space forthe twisted-pair and fiber-optic cabling.
In the back of the switch, leave at least 10.2 cm (4 in) of spacefor the cl module cabling.
On the sides of the switch, leave at least 7.6 cm (3 in) for cooling.

top

Install switch xl modules

Install switch modules into the slots as shown in the following illustration. For installation details, see the instructions in the manual that
comes with themodule.

CAUTION: Make sure user install only ProCurve Switch vl Modules. Switch gl/xl Moduleswill fit into Switch vl slots, but they will
not operate.
Avoid any electrostatic discharge problems by handling the modules only bytheir bulkheads.

The slot cover can be removed, and the module can be installed with either aflat-bladed or Torx T-10 screwdriver. Retain the slot cover for
future use.

NOTE:

 MODULE INSTALLATION NOTE

Any of the supported Switch vl Modules can be installed in any of the slots.
User can install, exchange, or remove modules after the switch has been powered on. Whenever a module is installed during this
process, it isinitialized and tested for correct operation. During this process, the switchSelf Test LED is on. If user hot swap another
module while the switch isinitializing and testing the first module, it is possible to cause the firstmodule or the entire switch to be
reset. To prevent the modules or switch from being reset when user must hot swap multiple modules, follow these precautions:

Do not install/remove any modules from the switch while the switch Self Test LED is lit.
Before removing or installing any modules, make sure that all network cables are disconnected from the module.

The modules employ low-force connectors. Using high force to insert the modules is not needed and should not be used.
Ensure user fully insert the modules. That is, press the module into the slot until the bulkhead on the module is contacting or is very
close to contacting the front face of the switch chassis.
Once the module is fully inserted, ensure that user screw in the two retaining screws to secure the module in place. The screws
should betightened until they are secure, but not overtightened.
If user do not use one or more of the slots, ensure the slot cover plate is still attached over the slot for safe operation and proper
switch cooling. For safety, user should not have more than one module slot uncovered at a time.

1. Insert module into the guides and slide it in until it is fully inserted. High insertion force is not needed and should not be used. For

best results, push near both screws.
Figure 1: Installing a module

Item Number

Description

1

Summary of Contents for 4202vl-48GS

Page 1: ... Getting Started Guide ProCurve Manager CD ROM and booklet Customer Support Warranty booklet Accessory kit 5065 6521 for the 8 slot 4208vl Switch 4208vl 64GSwitch 4208vl 96 Switch 4208vl 72GS Switch Accessory kit 5064 9943 for the 4 slot 4204vl Switch 4202vl 48G Switch 4202vl 72 Switch 4204vl 48GS Switch Each kit contains Two mounting brackets Six 10 mm M4 screws to attach the mounting brackets to...

Page 2: ...table for cable types and lengths Port Type Cable Type Length Limits Twisted pair cables 10 100 1000Base T For either 10 100 Mb s or 1000 Mbpsoperation Category 5 or better 100 ohm UTP or shielded Twisted pair STP balanced cable For 1000 Mbps Gigabit operation Category 5e cabling or better is recommended 100 m The Auto MDI MDI X feature only works when the port is in auto negotiation mode Fiber op...

Page 3: ... vl Modules can be installed in any of the slots User can install exchange or remove modules after the switch has been powered on Whenever a module is installed during this process it isinitialized and tested for correct operation During this process the switchSelf Test LED is on If user hot swap another module while the switch isinitializing and testing the first module it is possible to cause th...

Page 4: ...n Each supply provides enough power to operate afully loaded switch so even if one fails the switch will continue to operate normally Install the second power supply into power slot number 2 as shown in figure 3 The slot cover can be removed with either a flat bladed or Torx T 10 screwdriver Retain the slot cover for future use CAUTION The switch power supplies are hot swappable they can be instal...

Page 5: ...p Verify the switch passes self test After user have installed any modules and the optional second power supply but before mounting the switch in its network location user should first verify it is working properly by plugging it into a power source and verifying it passesits self test If user have installed a second power supply repeat these procedures with thesecond power supply to verify it wor...

Page 6: ...Ds go off User may see each port LED go ON briefly in sequence as theport is tested For the duration of the self test the Self Test LED stays ON When the self test completes successfully The Power LED stays on and the Status LEDs on the switch chassis stay on for the devices installed one for each switch module installed one for each power supply installed and one for all the fans The Fault and Se...

Page 7: ...0 5 in apart in each rack cabinet upright as shownin the illustration below Ensure that the screws are at the same level ineach upright Figure 8 Partially installed screw for bracket notch Item Number Description 1 Partially install a screw into the top hole of aclose 0 5 in pair on both sides of the rack 3 Place the switch in the rack and lower it so the notches in the bottom of the bracket slide...

Page 8: ...e 12 24 screws supplied with the switch use the clips and screws that came withthe cabinet Plan which four holes user will be using in the cabinet and installall four clips and partially install the two bottom screws as described in step2 before proceeding to step 3 top Horizontal surface mounting Place the switch on a table or other horizontal surface Use a sturdy surface in an uncluttered area U...

Page 9: ...cketsto the switch with the included10 mm M4 screws Figure 11 Attaching brackets to the rear of the switch Item Number Description 1 10 mm M4 screws 2 Attach the switch to the wall or wood surface with four 5 8 in number12 wood screwsor larger Not included Figure 12 Mounting to a wall Item Number Description 1 5 8 in number 12 wood screws top top Connect the switch to a power source 1 Plug the inc...

Page 10: ...ming switch management tasks including the following Monitor switch and port status and observe network activity statistics Modify the switch s configuration Read the event log and access diagnostic tools to help in troubleshooting Download new software to the switch Add passwords to control access to the switch from the console web browser interface and network management stations The console can...

Page 11: ...Configuration Guide top Hot swapping switch modules The switch modules can be hot swapped that is installed or replaced whilethe switch is powered ON The procedures differ slightly though between adding new modules to an empty slot or replacing modules with the same type and exchanging the module with a different type Adding or Replacing Modules If a module has to be replaced with one of the same ...

Page 12: ...r its affiliates subcontractors or suppliers will be liable for incidental special or consequential damages including downtime cost lost profits damages relating to the procurement of substitute products or services or damages for loss of data or software restoration The information in this document is subject to change without notice Hewlett Packard Enterprise Development and the names of Hewlett...

Reviews: