background image

Working Instruction

Document No. :SOP DDD FA Dis-ASS’Y    

Station

Station

Station

Station:

:___________

___________

___________

___________

Name

Name

Name

Name:

Ver

Ver

Ver

Ver....:

:_____ 

_____ 

_____ 

_____ 

Date

Date

Date

Date:

:___________

___________

___________

___________

Fixture List(Fixture standard)

Qty

Fixture List(Fixture standard)

Qty

Tabulator

Issuing department

IE

Wang Fang

If finding some defects, notice the gaffer and assistant

Points for attention:

1.Loosen SW Cover screws*3 
(6052A0051301) , 1~3

Torque

2.0 

±

0.5 Kgf

cm

2.Loosen bottom case 
screws(6052A0021902) * 2 , 4~5 

Torque

2.0 

±

0.5 Kgf

cm

Loosen screws

5(3/3)

2

1

3

Fig.1

5

4

For 17”

1.00

2007/7/20

Electric-hexagonal screwdriver

1

Summary of Contents for 541 - Notebook PC

Page 1: ... product Printed Circuit Boards PCB or Printed Circuit Assemblies PCA With a surface greater than 10 sq cm 3 Batteries All types including standard alkaline and lithium coin or button style batteries 2 Mercury containing components For example mercury in lamps display backlights scanner lamps switches batteries 1 Liquid Crystal Displays LCD with a surface greater than 100 sq cm Includes background...

Page 2: ...or screw driver 3 0 Product Disassembly Process 3 1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment 1 Follow steps described in Disassembly instruction file attached 2 If parts can be removed without using a tool remove it first 3 Use correct screwdriver and torque value before unlock the screw 4 5 6 7 8 3 2 Optional Graphic I...

Page 3: ...station version list A Current station version list A Current station version list B Version Modify list B Version Modify list B Version Modify list B Version Modify list Date Date Date Date Content Content Content Content Design Design Design Design Written by Written by Written by Written by Wang Fang Wang Fang Wang Fang Wang Fang Revision Revision Revision Revision Date Date Date Date 2007 7 20...

Page 4: ...______ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Fig 1 Fig 2 WLAN Cover DDR Cover 1 Disassemble Battery Fig 1 2 Disassemble DDR Cover and screws Fig 2 3 Disassemble WLAN COVER and screw Fig 3 Torque 2 0 0 5 Kgf cm Disassemble battery disassemble COVER 1 1...

Page 5: ..._____ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention HDD Cover Disassemble HDD 2 1 1 Fig 1 Electric crossing screw driver 1 1 Disassemble HDD COVER and screw 2 Fig 1 Torque 2 0 0 5 Kgf cm 2 Disassemble HDD Screws and HDD Fig 2 Torque 2 ...

Page 6: ...te Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Loosen screws 60520D046304 4 Torque 2 0 0 5Kgf cm Loosen bottom case screws 3 1 1 17 4 2 1 3 Electric hexagonal screwdriver 1 Only For 17 1 00 2007 7 ...

Page 7: ...te Date Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Loosen screw 4 1 3 Fig 1 Electric hexagonal screwdriver 1 2 1 4 3 1 Loosen screws 60520D046304 4 1 4 Torque 2 0 0 5 Kgf cm For 14 1 00 2007 7 20 ...

Page 8: ...e Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Loosen bottom case screws 60520D046304 3 Fig 1 Torque 2 0 0 5Kgf cm Loosen screws 4 2 3 Fig 1 2 1 3 For 15 1 00 2007 7 20 Electric hexagonal screwdrive...

Page 9: ...ate Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 17 3 2 1 Loosen bottom case screws 60520D046304 4 Fig 1 Torque 2 0 0 5 Kgf cm Loosen screws 4 3 3 Fig 1 1 4 For 17 1 00 2007 7 20 Electric hexagonal screwdr...

Page 10: ...___ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Loose screw 5 1 3 2 1 图一 图一 图一 图一 1 Loose SW Cover screws 2 6052A0051301 Fig 1 Torque 2 0 0 5 Kgf cm 2 Loosen bottom case screws 60520D046304 3 Fig 2 Torque 2 0 0 5 Kgf cm 2 3 图二 图二 图二 图二 1 For 14 ...

Page 11: ..._______ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Loosen screws 5 2 3 2 1 3 Fig 1 1 Loosen SW Cover screws 3 6052A0051301 Fig 1 Torque 2 0 0 5 Kgf cm 2 Loosen bottom case screws 2 6052A0021902 Fig 2 Torque 2 0 0 5 Kgf cm Fig 2 2 1 For 15 1 00 ...

Page 12: ... ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Loosen SW Cover screws 3 6052A0051301 1 3 Torque 2 0 0 5 Kgf cm 2 Loosen bottom case screws 6052A0021902 2 4 5 Torque 2 0 0 5 Kgf cm Loosen screws 5 3 3 2 1 3 Fig 1 5 4 For 17 1 00 2007 ...

Page 13: ..._ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Take down WLAN cable Fig 1 2 Take down ODD Fig 1 3 Take down HDD slot screw 1 6052A0030401 Fig 3 Torque 1 5 0 5 Kgf cm Take down WLAN Cable and ODD 6 1 1 Fig 1 Fig 2 1 Fig 3 1 00 2007 7...

Page 14: ... Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble K B 7 1 1 Fig 2 Fig 1 1 Tunrn over open LCM 2 Take down S W Cover Fig 1 Disassembly sequence C 2 B 3 Open K B Fig 2 1 1 2 2 A B A C 1 00 2007 ...

Page 15: ... Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble K B 8 1 1 Fig 2 Fig 1 1 Turn over open LCM 2 Take down S W Cover Fig 1 Disassembly sequence C 2 B 3 Open K B Fig 2 1 1 2 2 A B A C 1 00 2007 7...

Page 16: ... Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Take down SW C and K B FFC 9 1 1 Fig 1 1 Take down K B FFC from MB CNTR Fig 1 2 Take down K B 3 Take down S W FFC from MB CNTR 4 Take down SW C 1 00 2007 ...

Page 17: ...__ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Take down screws 2 6052A0030401 Fig 2 Torque 1 5 0 5 Kgf cm 2 Disassemble speaker 6039B0015002 6039B0014402 CNTR from MB Fig 1 Disassemble speaker 10 1 3 Fig 1 Fig 2 For 14 1 00 2007 7...

Page 18: ...__ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble speaker 10 2 3 Fig 1 Fig 2 For 15 1 Take down screws 2 6052A0030401 Fig 2 Torque 1 5 0 5Kgf cm 2 Disassemble speaker 6039B0015002 6039B0014402 CNTR from MB Fig 1 1 00 2007 7 ...

Page 19: ...___ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Take down screws 2 6052A0030401 Fig 2 Torque 1 5 0 5 Kgf cm 2 Take down speaker 6039B0015001 6039B0014401 CNTR from MB Fig 1 Disassemble speaker 10 3 3 Fig 1 Fig 2 For 17 1 00 2007 7 ...

Page 20: ...____ Date Date Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Take down Antenna cable Fig 1 2 Disassemble Antenna Cable Fig 2 Take down Antenna cable 11 1 3 Fig 2 Fig 1 For 14 1 00 2007 7 20 ...

Page 21: ...e Date Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 11 2 3 Fig 1 Disassemble Antenna cable Fig 2 chopsticks 1 For 15 1 00 2007 7 20 1 Take down Antenna cable Fig 1 2 Disassemble Antenna Cable Fig 2 ...

Page 22: ... _____ Date Date Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 11 3 3 Fig 1 Disassemble Antenna cable For 17 1 00 2007 7 20 1 Take down Antenna cable Fig 1 2 Disassemble Antenna Cable Fig 1 ...

Page 23: ...____ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble Antenna Lid SW Cable 12 1 3 1 Take down Lid SW Cable from MB CNTR Fig 1 2 Disassemble Lid SW Cable Antenna Cable Fig 1 2 Fig 1 Lid SW Cable Antenna Cable For 14...

Page 24: ...________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble Antenna cable 12 2 3 Fig 1 For 15 Lid SW Cable Antenna Cable 1 00 2007 7 20 1 Take down Lid SW Cable from MB CNTR Fig 1 2 Disassemble Lid SW Cable Antenna C...

Page 25: ...e Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble Antenna cable 12 3 3 Fig 1 For 17 1 00 2007 7 20 Fig 2 1 Take down Lid SW Cable from MB CNTR Fig 3 2 Disassemble Lid SW Cable Antenna Cable Fig 1 ...

Page 26: ...___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble Lid SW and LCM cable 13 1 3 1 Disassemble Lid SW board 1310A2139703 on the top case position latch Fig 1 2 Disassemble LCM cable Fig 2 Fig 1 For 14 1 00 ...

Page 27: ...___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 13 2 3 Fig 1 For 15 1 00 2007 7 20 Disassemble Lid SW and LCM cable 1 Disassemble Lid SW board 1310A2139703 on the top case position latch Fig 1 2 Disassemble LCM ca...

Page 28: ..._________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 13 3 3 图 图 图 图二 二 二 二 For 17 1 00 2007 7 20 Disassemble Lid SW and LCM cable 图二 图二 图二 图二 1 Disassemble Lid SW board 1310A2139703 on the top case position latch Fig 1 2 Disassemble...

Page 29: ...Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble screws 14 1 2 1 Disassemble LCM cable 2 Take down screws 2 60520D046304 torque 3 0 0 5 Kgf cm 2 1 Fig 2 For 15 1 00 2007 7 20 Electric hexagonal scr...

Page 30: ...______ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 2 1 Fig 1 Disassemble screws disassemble LCM cable 14 2 2 For 17 1 00 2007 7 20 1 Disassemble LCM cable 2 Take down screw 2 60520D046304 torque 3 0 0 5Kgf cm Electric hex...

Page 31: ...___ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble LCM 15 1 1 2 1 1 Fetch one side of LCM Disassemble screws 2 60520D046304 Torque 3 0 0 5 Kgf cm 2 Disassemble LCM For 14 Fig 1 2 1 Fig 2 For 15 2 1 Fig 3 For 17 1 00 2007 7 2...

Page 32: ..._______ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Turn over the whole unit 2 Disassemble ODD slot screws 6052B0097001 3 1 3 Torque 2 0 0 5 Kgf cm Screw can t be stripped Disassemble ODD slot screws 16 1 1 3 2 1 Fig 1 3 2 1 Fig 2 For 14 For 15 1 2 3 For ...

Page 33: ...ate ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Disassemble bottom case screws 60520D046304 5 Torque 2 0 0 5 Kgf cm Disassemble bottom case screws 17 1 3 3 4 2 1 For 14 1 00 2007 7 20 5 Electric hexagonal sc...

Page 34: ...ate ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble bottom case screws 17 2 3 5 1 Disassemble bottom case screws 60520D046304 5 Torque 2 0 0 5 Kgf cm 4 3 2 1 For 15 1 00 2007 7 20 Electric hexagonal sc...

Page 35: ...ate ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Disassemble bottom case screws 60520D046304 5 Torque 2 0 0 5 Kgf cm Disassemble bottom case screws 17 3 3 5 1 3 4 2 For 17 1 00 2007 7 20 Electric hexagonal sc...

Page 36: ..._______ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Disassemble screws under the case 2 60520D046304 Fig 1 Torque 2 0 0 5 Kgf cm 2 Turn over it 3 Disassemble screws 2 60520D046304 Fig 2 Disassemble screws 18 1 3 2 1 Fig 2 Fig 1 4 3 For 14 1 00...

Page 37: ...____ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 18 2 3 Disassemble screws 1 Disassemble bottom case screws 60520D046304 2 Fig 1 2 Turn over it 3 Disassemble screws 3 60520D046304 Fig 2 Torque 2 0 0 5 Kgf cm 3 2 1 图 图 图 图二 二 二 二 图 图 图 图一 一 一 一 2 1 For 15 1 ...

Page 38: ...___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble screws 18 3 3 1 Disassemble screws 2 60520D046304 Fig 1 2 Turn over it 3 Disassemble screws 3 60520D046304 Fig 2 Torque 2 0 0 5Kgf cm 2 3 1 图 图 图 图二 二 二 二 图 图 图 图一 一 一 一 2 1 For 17 1 00 200...

Page 39: ...te Date Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble TPCB 1 Disassemble top case Fig 1 2 Disassemble TOUCH PAD FFC from M B Fig 2 19 1 3 图 图 图 图二 二 二 二 For 14 1 00 2007 7 20 Fig 1 Fig 2 ...

Page 40: ...ate Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble TPCB 19 2 3 图 图 图 图一 一 一 一 FP CNTR For 15 1 Disassemble top case Fig 1 2 Disassemble TOUCH PAD FFC from M B Fig 2 1 00 2007 7 20 Fig 1 Fig ...

Page 41: ...te Date Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention Disassemble TPCB 19 3 3 Fig 1 图 图 图 图二 二 二 二 1 Disassemble top case Fig 1 2 Disassemble TOUCH PAD FFC from M B Fig 2 For 17 1 00 2007 7 20 Fig 2 ...

Page 42: ...Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 20 1 1 Disassemble Bluetooth 1 Disassemble Bluetooth screws 6052A0004501 2 2 Disassemble Bluetooth Cable from MB CNTR Fig 2 3 Disassemble Cable 6017A0042901 and Bluetooth Torque 1 0 0 5 Kgf cm Fig 1 2 1 Fig 2 Fig 3 Fig 4 For 1...

Page 43: ...___ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 21 1 1 Disassemble ODD extension plate 1 Disassemble ODD Extension plate Screw 6052A0020401 2 Fig 1 For 15 Only 2 1 Disassemble ODD Extension plate Screw Fig 2 For 17 Only Torque 1 5 0 5 Kgf cm Fig 2 17 4 2 1 ...

Page 44: ...______ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 22 1 1 Disassemble RJ11cable take down screws 1 Disassemble RJ11 Cable Fig 2 2 Disassemble MB screws 2 6052A0004501 Fig 3 Torque 1 0 0 5 Kgf cm Fig 1 OK NG Fig 2 Fig 3 1 00 2007 7 20...

Page 45: ...re List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 23 1 1 Disassemble Battery inverter board and MB 1 Disassemble 17 Batt Extension plate and screws 3 6052B0001601 Fig 1 For 17 Only 2 Disassemble M B Screws 1 6052B0001601 Fig 2 Torque 2 0 0 5 Kgf cm Fig 1 17 使用 使用 使用 使...

Page 46: ...____ _____ _____ _____ Date Date Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 24 1 2 Disassemble M B Fig 1 Fig 2 2 1 CRT port 1 Disassemble M B 1 00 2007 7 20 3 Fig 3 17 15 ...

Page 47: ... Date Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 24 2 2 Disassemble ODD inverter board 1 Disassemble 15 ODD inverter board Fig 1 17 ODD inverter board Fig 2 Fig 1 For 15 Fig 2 For 17 1 00 2007 7 20 ...

Page 48: ..._ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Take down screws 2 6052B0001601 2 Disassemble FAN Fig 1 2 6033B0006301 Torque 2 0 0 5kgf cm cm Disassemble FAN 25 1 1 Fig 1 1 2 Set 风 风 风 风扇 扇 扇 扇 Fig 2 1 2 Set Fan For 14 15 For 17 1 00 2007 7 20 ...

Page 49: ...re List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 26 1 1 Disassemble WLAN Fig 1 For UMA MB 1 1 Disassemble two screws of WLAN 6052A0030401 Fig 1 2 Disassemble WLAN 3 Take down two elastic screws of Thermal Fig 2 For discrete Torque 1 5 0 5 Kgf cm Electric hexagonal sc...

Page 50: ..._________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Take down thermal screws 4 2 Disassemble THERMAL MODULE from M B Torque 1 5 0 5 Kgf cm Disassemble CPU THERMAL 27 1 1 Fig 1 6043B0034801 UMA Part No For UMA MB 1 2 3 4 1 00 2007 7 20 Electr...

Page 51: ...e standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 28 1 2 CLOSED OPEN Flat screwdriver 1 Absorbing pen 1 Disassemble CPU Fig 1 Fig 2 OK CPU is stuck on SOCKET smoothly and completely NG CPU is inserted in SOCKET incompletely Fig 3 1 Put MB on supporting fixture 2 Take down CPU from ...

Page 52: ...Ver Ver Ver _____ _____ _____ _____ Date Date Date Date ___________ ___________ ___________ ___________ Fixture List Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 1 Disassemble DDR1 DDR2 Disassemble DDR 28 2 2 Fig 1 1 00 2007 7 20 ...

Page 53: ...re List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 29 1 1 Disassemble MODEM and RJ11 1 Take down two screws 6052A0030401 and take down MODEM Fig 1 2 2 Disassemble RJ11 Cable from PCB Cable Trim Clip 3 Disassemble RJ11 CABLE 6017B0119501 Fig 3 Torque 1 5 0 5 Kgf cm 图 图 图 图三 三 三 三 1 1 1 2 MODEM Cable Tri...

Page 54: ... Fixture standard Qty Fixture List Fixture standard Qty Tabulator Issuing department IE Wang Fang If finding some defects notice the gaffer and assistant Points for attention 30 1 1 1 00 2007 7 20 Visual inspect M B 1 Cosmetic inspect Don t touch LED lamp when fetching M B Fig 1 Cable trim clip can t be dropped Fig 1 Check Audio Jack iron dropped or not Fig 1 Check LCM CNTR PIN whether tilted or b...

Reviews: