9
Table 6
Rack-mounting procedures at a glance
Chassis
Procedure
diagram
Procedure references
•
5800-48G-PoE+ (2 slots)
•
5800-48G-PoE+ TAA (2 slots)
•
5820X-14XG-SFP+ (2 slots)
•
5820X-14XG-SFP+ TAA (2 slots)
Figure 5
1.
Attaching the mounting brackets to the chassis (for
all the switches except the
5800AF-48G/5820AF-24XG)
.
2.
Rack-mounting a 5800/5820X switch except the
5800AF-48G/5820AF-24XG
.
•
5800AF-48G
•
5820AF-24XG
Figure 6
1.
Attaching the mounting brackets, chassis rails, and
grounding cable to the chassis
(5800AF-48G/5820AF-24XG)
.
2.
Rack-mounting a 5800AF-48G/5820AF-24XG
switch
.
•
All other 5800 switches
•
5820X-24XG-SFP+
•
5820X-24XG-SFP+ TAA
Figure 7
1.
Attaching the mounting brackets to the chassis (for
all the switches except the
5800AF-48G/5820AF-24XG)
.
2.
Rack-mounting a 5800/5820X switch except the
5800AF-48G/5820AF-24XG
.
Figure 5
Rack-mounting procedure (1)
Figure 6
Rack-mounting procedure (2)
Figure 7
Rack-mounting procecure (3)
NOTE:
If a rack shelf is available, you can put the switch on the rack shelf, slide the switch to an appropriate
location, and attach the switch to the rack with the mounting brackets.