LS ISCSI_LUN FULL
For more information about using the utility or using the
CAPTURE
commands, see the
HP StorageWorks
Storage System Scripting Utility Reference
. See “
Required documentation
” on page 10 for the link to
this document.
Task checklist
Use the following checklist to track your progress and mark when a task has been completed. You
can initial and timestamp task completion if you like.
Table 5 XCS 6.220 Pre-upgrade task checklist
Task complete
Task
Checking current controller software version
Time required:
About 5 minutes
When to perform:
Any time before starting to upgrade your controller software.
Checking current software versions
, page 13
Time required:
10–15 minutes
When to perform:
Any time prior to the upgrade
Checking the storage system hardware
, page 15
Time required:
15–20 minutes
When to perform:
1–2 weeks prior to the upgrade, and then daily until the
upgrade is complete. Provide enough time to order and replace any failed
components.
Checking and upgrading your SAN infrastructure
, page 17
Time required:
After collecting and evaluating data on your configuration over
several weeks, a determination can be made regarding the appropriate time to
do the upgrade.
When to perform:
Any time prior to the upgrade
Managing application I/O timeouts for an online upgrade
, page 33
Time required:
Varies depending on number of applications
When to perform:
Any time prior to the upgrade
Back up all storage system data
, page 34
Time required:
Varies
When to perform:
As close as possible to the upgrade
Upgrading HP Command View EVA
, page 34
Time required:
15–20 minutes
When to perform:
Any time prior to the upgrade
Upgrading browser and Java Runtime Environment (JRE)
, page 36
Time required:
10–20 minutes
When to perform:
Any time prior to the upgrade
Pre-upgrade tasks
42
Summary of Contents for 6100
Page 8: ...8 ...
Page 44: ...Pre upgrade tasks 44 ...
Page 64: ...Upgrading the Enterprise Virtual Array 64 ...
Page 66: ...Downgrading the Enterprise Virtual Array 66 ...