Tie-Down kit 100
Securing the rack to the floor
The following illustration indicates where to drill the holes to secure the rack to the floor. The distances are
measured from the holes on the tie-downs. Have your building structural engineer drill the holes. After your
holes have been drilled, insert a bolt with a washer into each hole to secure the rack to the floor.
Enterprise Series Rack Tie-down kit
Enterprise Series Rack Tie-down kit contents
The Enterprise Series Rack Tie-down Kit includes the following items.
Item
Quantity
Tie-down bracket
2
M8 x 20-mm bolt
10
M8 flat washer
10
These kits might contain extra hardware for your convenience.
Installing the Enterprise Series Rack Tie-down kit
1.
Adjust the leveling feet on the rack so that the full weight of the rack rests on the leveling feet.
2.
Align the front tie-down with the holes on the front caster plate.