Chapter 4
Verifying and Booting Superdome
Performing a Visual Inspection and Completing the Installation
100
Performing a Visual Inspection and Completing the Installation
After booting the system, you should carefully inspect it and reinstall the EMI covers. Here are the steps
required to perform a final inspection and complete the installation:
Step 1. Visually inspect the system to verify that all components are in place and secure.
Step 2. Check that the cables are secured and routed properly.
Step 3. Check that the cell board ejectors are secure.
If the ejectors are broken or open, the cell board is disconnected.
Figure 4-8Cell Board Ejectors
Step 4. Reinstall the front EMI panel.
60IN055A
8/9/00
Cell Board Ejectors
See Detail
Cell Board Ejector
Summary of Contents for 9000 Superdome
Page 8: ...Contents 8 ...
Page 9: ...9 Preface ...
Page 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Page 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Page 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Page 24: ...24 ...
Page 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Page 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Page 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Page 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Page 193: ...Appendix F 169 F A180 Support Management Station ...
Page 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Page 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...