Chapter 5
Post Superdome System Installation Check
108
•
Inspect cabling. Check that all cables are installed, secured, and properly routed.
•
Inspect test points. Check that test leads are removed from the test points, and that the test points are
properly covered.
•
Clean up and dispose of debris. Remove all debris from the area, and dispose of it properly.
•
Perform final check. Inspect the area to ensure that all parts, tools, and other items used to install the
system are disposed of properly. Then, if you have not already done so, close and lock the doors.
•
Enter information in the Gold Book. When you complete the installation and cleanup, we recommend
that you make the appropriate notations in the Gold Book, which should have been shipped with the
system.
•
Obtain customer acceptance (if required). This includes thanking the customer for choosing
Hewlett-Packard.
Summary of Contents for 9000 Superdome
Page 8: ...Contents 8 ...
Page 9: ...9 Preface ...
Page 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Page 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Page 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Page 24: ...24 ...
Page 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Page 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Page 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Page 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Page 193: ...Appendix F 169 F A180 Support Management Station ...
Page 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Page 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...