Chapter 2
Unpacking and Inspecting
Unpacking and Inspecting Superdome Hardware Components
22
Step 4. Remove the shipping strap that holds the BPSs in place during shipping.
Figure 2-8Remove BPS Shipping Strap
Step 5. Remove the pallet mounting brackets and pads on the side of the pallet where the ramp slots are
located.
Figure 2-9Removing the Mounting Brackets
Step 6. On the other side of the pallet, remove only the bolt on each mounting bracket that is attached to
the SPU cabinet.
WARNING
Do not remove the bolts on the mounting brackets that attach to the pallet.
These bolts prevent the cabinet from rolling off the back of the pallet.
Step 7. Insert the ramps into the slots on the pallet.
2/29/00
60IN010A
BPS 5
BPS 4
Summary of Contents for 9000 Superdome
Page 8: ...Contents 8 ...
Page 9: ...9 Preface ...
Page 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Page 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Page 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Page 24: ...24 ...
Page 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Page 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Page 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Page 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Page 193: ...Appendix F 169 F A180 Support Management Station ...
Page 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Page 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...