Chapter 2
Unpacking and Inspecting
Unpacking and Inspecting Superdome Hardware Components
23
CAUTION
Make sure the ramps are parallel and aligned.
The casters on the cabinet should roll unobstructed onto the ramp.
Figure 2-10Positioning the Ramps
WARNING
The cabinet can weigh as much as 1400 lbs. Three people are required to
roll the cabinet off the pallet. Position one person at the rear of the SPU
cabinet and one person on each side.
60IN014A
10/27/00
Ramps
Summary of Contents for 9000 Superdome
Page 8: ...Contents 8 ...
Page 9: ...9 Preface ...
Page 21: ...21 IEC 60417 IEC 335 1 ISO 3864 IEC 617 2 International Symbols ...
Page 22: ...22 Figure 9 Superdome Declaration of Conformity Page 1 ...
Page 23: ...23 Figure 10 Superdome Declaration of Conformity Page 2 ...
Page 24: ...24 ...
Page 32: ...Chapter 1 Introduction Installation Warranty 8 ...
Page 130: ...Chapter 4 Verifying and Booting Superdome Enabling iCOD 106 ...
Page 172: ...Appendix A hp Server rx2600 Support Management Station Configuring the SMS 148 ...
Page 184: ...Appendix C Superdome LAN Interconnect Diagram 160 ...
Page 193: ...Appendix F 169 F A180 Support Management Station ...
Page 230: ...Appendix G Connecting Multiple SPU Cabinets Connecting Cables 206 ...
Page 256: ...Appendix H JUST Exploration Tool Error Conditions 232 ...