91
Figure 52 Remove the chassis (A10508) from the rack
1
1
2
2
(1) Loosen the captive screws that fix the mounting
brackets to the rack
(2) Slide the chassis outwards along the slide rails
5.
Put the chassis onto the pallet base of the wooden carton.
Removing cable management brackets and mounting brackets
Before repackaging the switch chassis, remove the cable management brackets and mounting brackets
from the chassis.
Removing the mounting brackets
To remove the mounting brackets:
1.
Prepare the packing box of the mounting brackets. Make sure that the box is clean, dry, and not
damaged.
2.
As shown in
Figure 53
, use a Phillips screwdriver to loosen the screws that fix the mounting
brackets to the chassis, and then remove the mounting brackets.