Chapter 1
1-1
Introduction
Inspecting the Shipment
1
Introduction
The HP 9000 D2xx and D3xx Class Enterprise servers can be mounted into a cabinet to
consolidate the pieces of the core system. The cabinet is available in a 1.6 meter (63.8
inches) size. The cabinet is offered as a factory integrated cabinet (A3764A) with one to
four D Class computers mounted, or a field integrated (A3765A) cabinet with no computers
mounted by the factory. Both cabinets have a usable depth of 0.905 meter (35.6 inches).
The cabinets have mounting columns that comply with EIA standard 23 inch mounting
flanges.
Inspecting the Shipment
When the shipment arrives, make sure the cabinet has been received as specified by the
carrier's bill of lading. Inspect the shipping container for evidence of mishandling during
transit. If the container is damaged or water-stained, ask that the carrier's agent be
present when the cabinet is unpacked. Refer to the instructions described in the Claims
Procedure section. If everything appears to be in satisfactory condition, proceed with the
unpacking instructions.
NOTE
Do not discard or destroy the shipping container or the packaging material. If
it becomes necessary to repackage the cabinet, these items will be needed. HP
also suggests that you keep this manual, in case you later have to repackage
the cabinet for shipment.
Claims Procedure
If the shipment is incomplete or if the equipment is damaged or fails to meet specifications,
notify the nearest Hewlett-Packard Sales and Support Office. If damage occurred in
transit, notify the carrier as well. Hewlett-Packard will arrange for replacement or repair
without waiting for settlement of claims against the carrier. If the shipment was damaged
in transit, keep the shipping containers and packaging material for inspection.
Summary of Contents for A3764A
Page 4: ...iv Contents ...
Page 6: ...vi Figures ...
Page 7: ...Tables vii Table 4 1 A3764A and A3765A Cabinet Replaceable Parts 4 4 ...
Page 8: ...viii Tables ...
Page 10: ...Preface ii ...
Page 14: ...Preface vi ...
Page 18: ...1 4 Chapter1 Introduction Installation Site Requirements ...
Page 28: ...2 10 Chapter2 Unpacking and Installation Repackaging the Cabinet for Shipment ...
Page 32: ...3 4 Chapter3 Cabinet Operation Turning Off the Computer System With UPS ...
Page 34: ...4 2 Chapter4 Removal and Replacement Procedures Figure 4 1 Cabinet Exploded View Front ...
Page 35: ...Chapter 4 4 3 Removal and Replacement Procedures Figure 4 2 Cabinet Exploded View Back ...
Page 56: ...4 24 Chapter4 Removal and Replacement Procedures Removal and Replacement Procedures ...
Page 59: ...Chapter 5 5 3 Computer Access Button up Procedures ...
Page 60: ...5 4 Chapter5 Computer Access Button up Procedures ...