The installation of the pre-loaded cabinets consist of the following steps:
1. Move the cabinet to installation site.
2. Lower the leveling feet. (This will prevent excessive wear on the casters.)
3. Connect the system console to the server.
4. Connect all user terminals to the server.
5. Connect all system peripherals to the server.
NOTE
Attaching cables while the rails are extended fully forward will ensure
sufficient slack for later maintenance.
6. Connect the cabinet power cord to the appropriate wall outlet.
NOTE
If the cabinet being installed contains a PowerTrust UPS option, perform the
steps under PowerTrust UPS Option.
7. Be sure all peripherals outside the cabinet are connected to wall outlets.
The cabinet/server system assembly is now ready for the power up process. Refer to
Chapter 4 for operating instructions.
Summary of Contents for A3764A
Page 4: ...iv Contents ...
Page 6: ...vi Figures ...
Page 7: ...Tables vii Table 4 1 A3764A and A3765A Cabinet Replaceable Parts 4 4 ...
Page 8: ...viii Tables ...
Page 10: ...Preface ii ...
Page 14: ...Preface vi ...
Page 18: ...1 4 Chapter1 Introduction Installation Site Requirements ...
Page 28: ...2 10 Chapter2 Unpacking and Installation Repackaging the Cabinet for Shipment ...
Page 32: ...3 4 Chapter3 Cabinet Operation Turning Off the Computer System With UPS ...
Page 34: ...4 2 Chapter4 Removal and Replacement Procedures Figure 4 1 Cabinet Exploded View Front ...
Page 35: ...Chapter 4 4 3 Removal and Replacement Procedures Figure 4 2 Cabinet Exploded View Back ...
Page 56: ...4 24 Chapter4 Removal and Replacement Procedures Removal and Replacement Procedures ...
Page 59: ...Chapter 5 5 3 Computer Access Button up Procedures ...
Page 60: ...5 4 Chapter5 Computer Access Button up Procedures ...