Standard Operation Procedure
Document No.
Nantucket
FA DIS ASS’Y SOP
Station
:
Name
: Ver. :
Date
:
Step
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Uen-tung
NPSU-PPE
Auditor
:
Uen-tung
3(1/1)
1.0
2017/6/13
圖一
1
2
3
4
1. Loosen Spacer screw*4
2. Disassemble Spacer
Disassemble
Spacer
Electric cross screwdriver #1
1