Ballast kit 23
1.
Install the two bottom cage nuts using the cage nut insertion tool included in your original rack
hardware kit.
2.
Count 16 holes up the rack, starting at the bottom cage nuts, and install the two top cage nuts using the
cage nut insertion tool.
3.
Align the screw holes of the ballast assembly with the installed cage nuts.