Baying kit 26
1.
Remove the front and rear doors.
2.
Remove the side panels (if present between the racks).
3.
Position the racks side by side, ensuring that the feet of the racks are on solid flooring (no cracks or
openings).
4.
Attach three baying brackets (either 24-inch or 600-mm depending on the floor layout) to the front and
rear of each rack set using two T-30 Torx screws in each bracket.
-or-
Summary of Contents for HP 10000 G2 Series
Page 35: ...Cable Management Bracket kit 35 Installation is complete ...
Page 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Page 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Page 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Page 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...