Step
:
Standard Operation Procedure
Document No. Autobot
FA DIS ASS’Y SOP
Station :
Name
: Ver. :
Date
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Tzan.uen-tung
NPSU-PPE
Auditor
:
Tzan.uen-tung
1.Disassemble battery cable CNTR
2.Loosen SSD screw *1 , Disassemble SSD.
3.Loosen Battery screw *6, Disassemble Battery.
2(1/1)
Disassemble battery & SSD
Fig.1
Fig.2
4
5
1
2
6
3
Fig.3
2017/7/22
1.00
Electric torx screw driver(#1)
1