14. Route and connect the data and power cables.
Hewlett Packard Enterprise recommends using embedded SATA solutions when connecting the cable. Other options
exist.
15. Install drives or blanks (Drive options).
16. Install the access panel (Install the access panel).
17. Install the server in the rack.
19. Connect each power cord to the server.
20. Connect each power cord to the power source.
Primary PCI riser cage options
The primary PCI riser cage supports the following:
Hardware options installation
87
Summary of Contents for HPE ProLiant DX360 Gen10
Page 7: ...Regulatory information 183 Documentation feedback 184 Acronyms and abbreviations 185 7 ...
Page 44: ...Operations 44 ...
Page 101: ... Full length Hardware options installation 101 ...
Page 107: ... 10 SFF SAS SATA NVMe Combo 4 LFF Hardware options installation 107 ...
Page 150: ...2 SFF backplane to P816i a controller 10 SFF NVMe backplane to NVMe riser Cabling 150 ...
Page 151: ...2 SFF NVMe backplane to primary riser 1 SFF rear backplane to system board SATA Cabling 151 ...