11. The Configuration Summary dialog box lists the configuration of the blade. If the information
is correct, select
Commit
.
12. The blade is now registered with the active management console and a passive management
console is installed and registered on the blade.
13. The GUI now shows the fourth blade in the cluster.
Using the new storage
To make the new storage available to the cluster, take these steps:
•
Verify the vendor storage
•
Import the new physical volumes into the IBRIX database
•
Extend an existing file system to include the new physical volumes or create a new file system
106 Completing the X9730 Performance Module installation