The wizard makes the following checks:
•
Pings the VC management IP address.
•
Verifies the
hpspAdmin
account created earlier.
If a check fails, take the corrective actions described on the GUI.
19. The wizard now configures the remaining bays for the Virtual Connect modules in the chassis.
20. The wizard verifies the VC configuration and then creates an
hpspAdmin
user account on
each iLO.
21. The wizard validates the VC configuration and verifies the SAS firmware. If necessary, the
SAS switches are flashed with the correct firmware.
22. The wizard verifies the SAS configuration. After determining the correct layout of the storage
hardware, the wizard configures the SAS switch zoning so that couplets see the same storage.
120 Expanding an X9720 or X9320 10GbE cluster by an X9730 module