54.
Connect on page 108
Connect the following air hoses at the ILP
front:
Input hose from mains air supply to
Inlet
connection.
Long outlet hose from
Outlet to PE
connection to PE1.
Long outlet hose from
Outlet to UW
connection to unwinder.
55.
Install the ILP rear
panel safety cover on
page 111
Install safety cover at the ILP front.
56.
Install the ILP
vacuum hoses on
page 112
Connect the vacuum hose to the ILP.
57.
Installing the ink
cabinets on page 113
Install each ink cabinet according to color
order shown in Figure 93 on page 113 for
four colors, and Figure 94 on page 113 for
seven colors.
If more than four colors to be installed,
make sure that relevant calibration kit is
ordered for extra colors.
Ink cabinets
(90 mins)
58.
Place on page 116
Mount and install the corian working
surface.
Mount the monitor, keyboard and mouse
on working surface.
Web guide
(10 mins)
59.
Adjusting the web
guide on page 116
Remove the two securing screws and
adjust the web guide.
Customer to save screws.
To troubleshoot, refer to w3200 service
manual
Calibrations
.
Utility
cabinets
(20 mins)
60.
Install the utility
cabinet on page 117
Install the utility cabinets and connect
hoses from utility cabinets to the printing
engines.
Cooling water in
Cooling
water
out
Solid add compressed air
Impression drum cooling drain
Vacuum
Air
flow
Connect control cable and power cable to
utility cabinets.
61.
Connect the
computers on page
121
Check the network diagrams in Figure 102,
Figure 103, and Figure 104 on page 121 -
122.
Install Slaves 1 and 2 computers in
electrical cabinet M2.
62.
Install the computer
cables on page 126
Install the computer cables to both slave
computers.
Computers
installation
(40 mins)
63.
Install the master
console on page 127