Installation Manual
CA294-03070 rev 00
page 137 of 153
4.
Release the emergency stop button at the Hunkeler finishing unit.
IMPORTANT:
Before beginning the following tests, make sure
that the following cables are connected to the in-
line finisher interface cables:
Cable CC71 from the PE2 junction box to the
interface cable from the inline finisher.
Cable CC101 from electrical cabinet M1 X52/53
interlock cable to the interface interlock cable from
the finisher.