Installation Manual
CA294-03070 rev 00
page 68 of 153
Figure 48 Electrical cabinet M1 PLC, MPI, and Profibus connections
1
PLC (53A1 - 53A3)
2 Mode
selector
3 Memory
cartridge
4 Cables
cover
5
Communications cable connection to PC
11.
Install the CTNET cables as follows:
Cable
From end point
To end point
Notes
-
Unidrive
24U0
unwinder web
motor controller 5 pin connection
at
UD75
in electrical cabinet M1
Electrical cabinet M2
U029
turnbar feed (FX) controllers 5-pin
connection at UD75
-
Electrical cabinet M2
U029
turnbar feed (FX)
Electrical cabinet M2
U028
exit
nip feed (FE) controllers 5-pin
connection at UD75
-
Electrical cabinet M2
U028
exit
nip feed (FE)
Electrical cabinet M2
U027
IMP
engage of PE2 (IP2) controllers 5-
pin connection at UD75
Green CTNET cable
connects between all
Unidrives from UW to FX
to FE to IP2 to FP2 to IP1
to FP1
-
Electrical cabinet M2
U027
IMP
engage of PE2 (IP2)
Electrical cabinet M2
U026
PE2
feed (FP2) controllers 5-pin
connection at UD75
-
-
Electrical cabinet M2
U026
PE2
feed (FP2)
Electrical cabinet M2
U025
IMP
engage of PE1 (IP2) controllers 5-
pin connection at UD75
-
-
Electrical cabinet M2
U025
IMP
engage of PE1 (IP1)
Electrical cabinet M2
U024
PE1
feed (FP1) controllers 5-pin
connection at UD75
-
NOTE:
All electrical cables are to be routed appropriately under the
floor platform.