Installation Manual
CA294-03070 rev 00
page 9 of 153
Heading
Step
Reference
Procedure
Notes and
check
16.
Install the electrical
cabinet-to-cabinet
cables on page 61
Install electrical cabinet M2 to cabinet M1
cabling.
Install electrical cabinet M1 to cabinet M2
cabling.
17.
Install the electrical
cabinet M1 cables to
PE1, PE2 on page 62
Install electrical cabinet M1 to PE1 and
PE2.
18.
Install the electrical
cabinet M2 to PE1,
PE2 on page 62
Install electrical cabinet M2 to PE1 and
PE2.
19.
Install the electrical
cabinet M1-to-master
console cables on
page 63
Install the electrical cabinet M1-to-master
console cables.
Leave the cables ends at the cabinet until
installation of the raised floor and master
console.
20.
Install all Unidrive
cables on page 66
Install all PE1 and PE2 Unidrive cables in
electrical cabinets M1 and M2.
21.
Install the PE1-to-
PE2 cables on page
67
Install the PE1-to-PE2 cables.
22.
Install the PROFIBUS
cables as on page 67
Install ProfiBus communication cable
between electrical cabinets M1 and M2 and
PLC in cabinet M1.
23.
Install the CTNET
cables on page 68
Install CTNet cables between all Unidrives
at electrical cabinets M1 and M2.
24.
Route the MPI
(MODBUS) cables on
page 69
Route the MPI (MODBUS) cable through
the ILP connection panel to the front of
PE1 and connect JTBD of the cable to
PTBD of the TBD.
Route the remaining connector JTBD to the
exit are of PE2 and connect it to PTBD of
the TBD.
Wait for floor and
ILP to connect.
Electrical
wiring
(180 mins)
25.
Connect the ProfiBus
and CTNet cable
connections on page
69
Connect the following ProfiBus and CTNet
cable connections at electrical cabinets M1
and M2
Vacuum
hoses
(40 mins)
26.
Installing the vacuum
hoses on page 70
Remove under-panel
Install and route all vacuum hoses from
electrical cabinets M1 and M2 to PE1, PE2
(short hoses 2-3 m), and ILP.
Wait for the raised floor and ILP to install
long hose (3-4 m).
Reinstall lower under-panel
2
nd
Day
Floor platform
27.
Install the floor
platform on page 72
Install floor platform according to
specifications in Site Preparation Guide.
Start at unwinder and ILP area. For press,
start at corners of press or wall.