Installation Manual
CA294-03070 rev 00
page 8 of 153
Quick reference checklist
The following procedure is a quick reference guide of the installation procedure intended for two
integrators and extended over five days.
Heading
Step
Reference
Procedure
Notes and
check
1
st
Day
Pre-installation
Site
preparation
1.
Verifying site
preparation on page
23
Verify site preparation as per Site
Preparation Guide
Site Preparation
check list
Measuring
and marking
2.
Marking the
pressroom floor on
page 23
Use marker pen to mark profile of press,
cabinets, unwinder, ILP and Finisher on
floor
Marker pen
Cable meter
Unpacking 3.
Unpacking the boxes
on page 23
Unpack the boxes and verify their contents
either with the BOM or Packing list on page
17.
Packing list
Installation
Electric
cabinets
(20 mins)
4.
Installing the
electrical cabinets on
page 24
Install electrical cabinet M1 and M2 in their
marked position.
5.
Position the u-bases
on page 24
Position the u-bases on the floor. Adjust
distance between u-bases to 693.0 mm at
a height of 200 mm. from the floor.
6.
Position the foresight
stand on page 28
Use surveying tool to align u-bases
accurately. Raise the tripod and surveying
tool to 1550.0 mm.
U-bases
(40 mins)
7.
Install the junction
bars on page 32
Install the junction bars between the two u-
bases.
8.
Mount the PE2 on the u-base. Use the
lifting and positioning assembly.
9.
install the platform on
page 43
Install the platform between the printing
engines.
10.
Mounting the turnbar
on page 44
Mount the turnbar assembly to PE1.
11.
Mount the PE1 on the u-base. Use the
lifting and positioning assembly.
12.
level each printing
engine on page 46
Level each printing engine to an accuracy
of 0.0 ± 0.1 mm
13.
align the printing
engines on page 49
Accurately align the printing engines
horizontally using the surveying tool.
14.
Securing the turnbar
on page 54
Mount the front and rear connection
brackets on the extended shaft of idler 3.
Install using M5 screws at front and rear.
Install collar on idler at rear.
Recheck the alignment using the surveying
tool.
Packed with PE2
Printing
engines
(160 mins)
15.
connect the printing
engines on page 56
Install front link brackets to attach two PEs.
Recheck alignment using surveying tool.
Check parallelism between PEs using the
parallel jig. Measure to an accuracy of
0.00 ± 0.01 mm