2-5
Installing the Switch
Installation Procedures
1. Prepare the Installation Site
■
Cabling Infrastructure
- Ensure the cabling infrastructure meets the
necessary network specifications. See appendix A,
“Cabling and
Technology Information Specifications”
for more information:
■
Installation Location
- Before installing the switch, plan its location and
orientation relative to other devices and equipment:
•
In the front or back of the switch, depending on where the ports are
located, leave at least 7.6 cm (3 inches) of space for the twisted-pair
cabling.
•
In the back of the switch, leave at least 3.8 cm (1 1/2 inches) of space
for the power cord.
•
On the sides of the switch, leave at least 7.6 cm (3 inches) for cooling.
Summary of Contents for J9661A
Page 2: ......
Page 3: ...HP V1410 Switch Series Installation and Getting Started Guide ...
Page 8: ...vi Contents ...
Page 34: ...2 20 Installing the Switch Sample Network Topologies ...
Page 50: ...B 2 EMC Regulatory Statements Regulatory Statements Japan VCCI Class A Korea Taiwan ...
Page 58: ...4 Index ...