Removal and replacement procedures 26
7.
Press the release lever and lift the chassis out of the rack.
8.
Place the chassis on a flat surface.
Install the access panel
IMPORTANT:
After performing a procedure inside the chassis, always install the access panel on
the chassis when complete. Do not operate the chassis for long periods of time with the access
panel removed.
To install the component:
1.
Place the access panel on top of the chassis.
2.
Slide the access panel toward the front of the chassis. The access panel locks into position.
Install the chassis into the rack
WARNING:
The chassis is very heavy. To reduce the risk of personal injury or damage to the
equipment, do the following:
•
Observe local occupational health and safety requirements and guidelines for manual
material handling.
•
Get help to lift and stabilize the product during installation or removal, especially when the
product is not fastened to the rails. The chassis weighs more than 81.65 kg (180.00 lb), so at
least four people must lift the chassis into the rack together. An additional person may be
required to help align the chassis if the chassis is installed higher than chest level.
WARNING:
To avoid risk of personal injury or damage to the equipment, do not stack anything
on top of rail-mounted equipment or use it as a work surface when extended from the rack.