Removal and replacement procedures 21
Removal and replacement procedures
Required tools
You need the following items for some procedures:
•
T-10 Torx screwdriver
•
T-15 Torx screwdriver
Preparation procedures
To access some components and perform certain service procedures, you might need to perform one or more
of the following procedures:
•
Power down the chassis (on page
If the replacement procedure is for a non-hot-plug component or requires removing the chassis from a
rack, you must power down the chassis.
•
Open the cable management arm (on page
•
Disconnect the cable management arm (on page
•
Extend the chassis from the rack (on page
•
Remove the access panel (on page
•
Remove the chassis from the rack (on page
•
Install the access panel (on page
•
Install the chassis into the rack (on page
•
•
Log in to the iLO CM firmware (on page
Power down the chassis
CAUTION:
The Chassis UID flashes if a firmware update is occurring in the system. A switch or
cartridge UID flashes if that target undergoing a firmware update. Chassis and target power
should not be altered while a firmware update is underway.
1.
Log in to the iLO CM firmware (on page
2.
Power down each cartridge by issuing the following commands:
set node power off force <
CxNy
>
set node power off force all
3.
Power down each switch by issuing the following commands:
set switch power off {a|b|all}
4.
Remove all power:
a.
Disconnect each power cord from the power source.
Summary of Contents for Moonshot 1500
Page 12: ...Customer self repair 12 ...
Page 13: ...Customer self repair 13 ...
Page 14: ...Customer self repair 14 ...