Cabling the HP Moonshot System 38
•
Moonshot 4QSFP+ Uplink Module
Connecting power cables and applying power to the
chassis
1.
Connect the power cables to the power supplies.
2.
Connect the power cables to the power source (UPS or wall outlet) or to an installed PDU.
3.
Wait while the chassis powers on.
Power-on events
The following power-on events occur after applying power to the chassis:
1.
Fans begin operating.
2.
iLO starts.
3.
Front panel LEDs display the status of initializing components:
o
Switches begin initializing.
o
Cartridges begin initializing.
4.
iLO runs fan and power tests.
Routing cables on the cable management arm
Route all rear panel cables through the cable management arm.
For more information about the cable management arm, see the
Quick Deploy Rail System Installation
Instructions
that ship with the Quick Deploy Rail System kit or in the HP Moonshot Information Library
Summary of Contents for Moonshot 1500
Page 57: ...Support and other resources 57 ...