Standard Operation Procedure
Document No. : NAIROBI FA DIS ASS’Y SOP
Station
:
Name
: Ver. :
Date
:
Step
:
:
:
:
Disassemble FAN
1. Loosen FAN set screw * 2, then remove the
FAN. (Fig.1)
4(1/1)
0.1
2012/10/30
1
2
Before
Fig.1
After
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Alicia Chien
NPSU-SE
Fig.2
Electric cross screwdriver (1#)
1