36
HP Restricted
NAS 4000s and 9000s Installation Guide
DRAFT
Template date: 09/2003
Use
Table 3
to determine which nodes and storage devices should
be powered on during each step.
Table 3: Power Sequencing for Cluster Installation
Step
Node
1
Additional
Nodes
Storage
Comments
Setting up
networks
On
On
Not
Presented
Verify that all
storage devices on
the shared bus are
not presented. Power
on all nodes.
Setting up
shared disks
On
Off
Presented Shutdown all nodes.
Present the shared
storage, then power
on the first node.
Verifying Disk
Configuration
Off
On
Presented Shut down first
node, power on the
next node. This
process will need to
be repeated for all
cluster nodes.
Configuring
the First Node
On
Off
Presented Shutdown all nodes;
power on the first
node.
Configuring
the Second
Node
On
On
Presented Power on the next
node after the first
node has been
successfully
configured. This
process will need to
be completed for all
cluster nodes.
Post-installation On
On
Presented At this point all
cluster nodes should
be on.