Periodic maintenance 61
Periodic maintenance
Periodic maintenance overview
Perform periodic inspections on the components in this section to be sure that the HP POD 20c continues to
perform within the designed parameters.
Qualified personnel
Qualified personnel are identified as personnel who are:
•
Properly trained in the operation and maintenance of the HP POD 20c
•
Customer-authorized to conduct maintenance activities
Qualified personnel can be:
•
HP personnel
•
Agents for HP
•
Site maintenance personnel
Cooling system
Component to be inspected
Task
Frequency
Capable Party
Air filters
Inspect and replace as necessary As needed (at
least quarterly)
Qualified personnel
Air filter differential pressure
sensor
Inspect and replace as necessary Annually
Qualified personnel
Cooling system leak check
Verify that there is no visible
chilled water leakage from the:
•
Heat Exchanger
•
CWS piping
•
CWR piping
If a leak is detected, see "Leak
)."
Quarterly
Qualified personnel
Condensate drain pans
Inspect and verify that the:
•
Pans are free of debris
•
Pans have no leaks
•
Leakage detectors are in
proper position
Clean pans as necessary
Quarterly
Qualified personnel
Condensate drain pan sensors
Inspect, test, and replace as
necessary.
If a leak is detected, see "Leak
)."
Quarterly
Qualified personnel