2-16
Installing the HP 5400 zl Switches
Installation Procedures
Installing the HP 5400 zl
Switches
2.
Partially install a screw into the top hole of a pair of holes that are 0.5
inches apart in each rack/cabinet upright as shown in the illustration
below. Ensure that the screws are at the same level in each upright.
Partially install a screw
into the top hole of a
close (0.5-inch) pair on
both sides of the rack
Figure 2-8. Mounting screw positioning
3.
Place the switch in the rack and lower it so the notches in the bottom of
the bracket slide onto the screws, then tighten these screws.
lower the switch with
mounting brackets onto the
partially installed screws,
then tighten these screws
Figure 2-9. Notches in bracket being installed
Summary of Contents for ProCurve 5400zl Series
Page 1: ...HP 5400 zl Switches Installation and Getting Started Guide Power over Ethernet ...
Page 2: ......
Page 3: ...HP 5400 zl Switches Installation and Getting Started Guide ...
Page 10: ......
Page 60: ......
Page 93: ...5 15 Troubleshooting HP Customer Support Services Troubleshooting ...
Page 94: ...5 16 Troubleshooting HP Customer Support Services Troubleshooting ...
Page 110: ......
Page 134: ......