The following is an example list of considerations during the planning phase
specific to the 3500yl Switches:
■
What if power is lost to the switch?
•
Power for the switch to operate (system power)
•
Power for PoE devices
■
Which devices to plug into which ports and with what priorities?
•
Port prioritization
•
Port priority class
•
Reserve watts
•
Total watts available (398)
■
Which bank of 24 ports will be used?
■
Will load balancing be used?
■
Will any mini-GBICs be used and in what ports?
■
Should the 620 RPS/EPS be plugged into a different power source than
the switch it is going to back up.
Summary of Contents for ProCurve 600
Page 1: ...Power over Ethernet HP ProCurve Power over Ethernet PoE PoE Planning and Implementation Guide ...
Page 2: ......
Page 3: ...Power over Ethernet PoE PoE Planning and Implementation Guide ...
Page 42: ......
Page 66: ......
Page 70: ......
Page 80: ......
Page 90: ......
Page 102: ......
Page 120: ......
Page 152: ......
Page 156: ......
Page 166: ......
Page 167: ......