Hardware options installation 33
12.
Remove the thermal interface protective cover from the heatsink.
CAUTION:
To avoid damage to the system board, processor socket, and screws, do not
overtighten the heatsink screws. Use the wrench supplied with the system to reduce the
possibility of overtightening the screws.
13.
Install the heatsink. Insert both screws, and then alternate tightening until the heatsink is seated
properly.
14.
Install the access panel (on page
13
).
15.
Install the server blade ("
Installing a server blade
" on page
17
).
Mezzanine card option
Optional mezzanine cards are classified as Type I mezzanine cards and Type II mezzanine cards. The
card type determines where it can be installed in the server blade.
•
Install Type I mezzanine cards on either mezzanine 1 connector or mezzanine 2 connector.