Removal and Replacement Procedures
2-24
HP ProLiant DL145 Generation 2 Server Maintenance and Service Guide
e.
Route the SCSI cable underneath the three cables you disconnected in the previous
step.
f.
Arrange the ATX processor power cable, the ATX system board power cable, and the
I
2
C PSU
cable over the routed SCSI cable, then reconnect them to their
corresponding system board connectors.
Figure 2-28: SCSI cable routing for standard height/full-length
controller boards phase 3
g.
Route the SCSI and power cables through the cable management opening of the
chassis’ partition wall.
h.
Connect the SCSI and power cables to their corresponding connectors on the rear of
the new drive.
Make sure the terminated end of the SCSI cable is positioned in the manner
illustrated Figure 2-29.
i.
Check that all cables are clear of the hard drive carrier and are properly routed to
their corresponding connectors, then tighten the screw that secures the hard drive
assembly to the chassis.
All manuals and user guides at all-guides.com