6.
Install the component:
a.
Firmly seat the FlexibleLOM in the slot.
b.
Tighten the thumbscrew.
7.
Install the access panel (
on page 25).
8.
Slide the server into the rack.
9.
Connect the LAN segment cables.
10.
Connect each power cord to the server.
11.
Connect each power cord to the power source.
12.
Power up the server (
on page 24).
104
Hardware options installation